在既有車站上,補一道門Adding a door to a station already in service.
板橋站是新北的轉運核心,既有站體周邊已被商業與住宅街廓包夾。新增出入口的難處不在造型,而在介面。
Banqiao is the main interchange of New Taipei, and the existing station is hemmed in by commercial and residential blocks. The difficulty of a new entrance is not its form — it is the interfaces.
地下既有結構、車站營運動線、街道退縮與相鄰建物,每一項都先於設計存在。設計以一個抬起的白色量體回應:地面層釋放為可穿越的開放廣場,二層以連通空橋接回既有站體,把新增的服務空間放在橋上,讓地面留給人與樹。
Existing underground structure, operating passenger flows, street setbacks and neighbouring buildings all pre-date the design. The answer is a lifted white volume: the ground plane is given back as an open plaza, while a second-level bridge carries the new service spaces and links to the station.
一眼可辨的入口An entrance you can find at a glance.
外皮以鋁複合板組成折面,於挑空處內襯擴張金屬網,白天反射天光、夜間成為街道端景。核心垂直動線以明黃色標定,從街道任一角度都能一眼認出入口位置——這是交通建設最基本、也最常被造型犧牲的功能。
Folded aluminium composite panels form the skin, lined with expanded mesh at the voids — daylight by day, a lit marker by night. The vertical core is coded in yellow so the entrance reads from any street corner: the most basic function of transport architecture, and the one most often sacrificed to form.
先確定介面,再確定形狀Interfaces first. Form is what is left.
本案以 BIM 作為溝通與檢核的單一模型:既有站體與新建結構套圖、CSD/SEM 介面檢討,在設計階段先行排除衝突;審議階段則以 BIMx 與透視模型向委員說明量體對街道的影響。造型是介面協調完之後剩下的那個結果。
A single BIM model carried the project: existing station and new structure overlaid, clash and interface reviews run during design rather than on site, and BIMx walkthroughs used to explain the massing to the review board.
Project Data案件資料Facts and figures.
- 業主
- 新北市政府捷運工程局
- 地點
- 新北市板橋區
- 類型
- 公共工程 · 交通建設 · 統包
- 昰方角色
- 建築設計 · BIM 整合
- 設計年份
- 2025
- 狀態
- 設計階段
- 主要材料
- 鋁複合板 · 擴張網 · 玻璃